CHADWELL HEATH FOUNDATION SCHOOL

Foundation School
Completed 2000


A new build consisting of a drama suite of two drama studios with dual control room, an
office, store room, and a media suite comprising a 3-camera studio, studio control room, off
line sound and video edit suites for small groups.


The performing arts facilities feature a dual control room fitted with computer lighting
control, flexible sound systems, curtains and sound-proofing, to provide a space suitable for
lessons and performances.


The main studio is connected to the second studio via a joint storage area; this enables the
second studio to be used as dressing rooms or foyer for productions.


The main studio shares a PA system with the hall, which is connected to the drama block.


The media department is equipped with off-line digital editing systems, a digital camera, a
computer network, and digital computerised sound studio equipment.